Mobile production systems

We have 4 mobile systems for delivery of eco-bases and eco-stabilising, which can start to operate within a week in any construction site in Poland. Presently they are located in the production plant in Rybnik.

  • NISSBAU

The ash and slag system is equipped with four slag tanks, each with the capacity of 9 m3, three horizontal ash tanks with the capacity of 76 m3, each with a worm conveyor and air aeration, a belt conveyor with the width of 1000 mm with a weighing system, a belt conveyor with the width of 800 mm conveying the material to a mixer and a mixer assembly with enclosed water nozzles controlled from the operator’s panel. Appropriate arrangement of the spraying nozzles allows to obtain required humidity. The mixer has the capacity of up to 130 ton/h. 
The tanks are loaded with the use of pneumatic transport from trunk cisterns. The operator’s cabin equipped with a control pulpit with a visual overview allows the operator to monitor the production process on an ongoing basis.

  • 2 systems ARAN I, ARAN II,

Each of the systems of ash and slag mixtures is equipped with four slag tanks, four belt conveyors collecting slag with variable capacity, a mixer assembly with enclosed water nozzles and ready product scales with the width of 1000 mm conveing the product from the mixer to the vehicle. Appropriate arrangement of the spraying nozzles allows for obtaining of required humidity of the product. The tanks are loaded with the use of pneumatic transport from trunk cisterns.

 

 

Production: